Closed Beta — Limited Spots

Every clause that decides
your bid.

BidSafe reads any RFP, RFQ, or tender and shows you every requirement, blocker and date it found — each one on the page it came from. You make the call.

Mandatory requirements extracted automatically
Disqualifiers flagged before you waste a week
Every requirement and blocker traced to its clause and page
Deterministic rule-based analysis — not an AI making guesses. Every flag traces to the exact clause that triggered it.
Document
GMWC-2016-03 — Computerised Maintenance System
Document type
Invitation to Tender — 2 gates to verify
0
Requirements found
66 flagged mandatory
0 Mandatory0 Blockers0 Key Date
Hard Disqualifier
Proposals received after the Closing Date will NOT be considered
Source: Page 5, Section 6

One missed clause can kill your bid.

Most businesses find out too late.

Weeks of work, wasted
The average RFP response takes 33 hours. Missing a single mandatory requirement means automatic disqualification — after all that effort.
Buried disqualifiers
Critical rejection clauses hide in dense legal language on page 47. By the time you find them, you've already committed your team.
Low win rates
The average RFP win rate is 39% — most of that effort does not become revenue. The first step to winning more is bidding on the right ones.
Source: Loopio 2026 RFP benchmark (time per response; average win rate).

Upload. Analyze. Decide.

The clause and the page behind every flag.

1
Step 1 — Upload
Drop in your document
Drop in your RFP, RFQ, or tender PDF. Any format, any jurisdiction.
2
Step 2 — Analyze
Every clause, read
BidSafe's deterministic engine reads every clause, extracts requirements, and flags risks — no AI hallucinations, every finding traceable to the source document.
3
Step 3 — Decide
Every clause, on its page
Get the requirements, the blockers, the eligibility gates and the dates — each traced to the exact clause and page that produced it. You see what the tender demands before you commit a week to it.

Everything you need to make the call.

Bid / No-Bid Recommendation
A clear recommendation with a 0–100 risk score and the specific reasons behind it.
Mandatory Requirements
Every requirement your proposal must address, extracted automatically and categorized by type.
Disqualifier Flags
Hard blockers that will get you rejected — surfaced immediately, not buried in your read-through.
Key Dates
Submission deadlines, question periods, and critical milestones — never miss a closing date again.

Apply for Early Access

We're onboarding contractors manually. No black-box AI. No demo call required — just tell us about your work and we'll reach out personally.

First name is required.
Last name is required.
Company name is required.
Your role is required.
We'll send your beta invite here.A valid business email is required.
Please select your company size.
Please select your annual revenue.
Please select your annual bid volume.
Please select at least one procurement type.
🔒 Your documents stay private. This waitlist form is delivered to us through Formspree; we don't share your application data with anyone else.